Section 1: Project Overview


The New Fort Lauderdale U.S. Courthouse is a $196 million design-build project currently under construction at 315 SW 11th Street in Fort Lauderdale, Florida. The U.S. General Services Administration (GSA) awarded the design-build contract to Brasfield & Gorrie, LLC in February 2023, with Skidmore, Owings & Merrill (SOM) serving as the Bridging Architect. APSI Construction Management serves as the Construction Manager Advisor.


The building rises 10 stories to approximately 203 feet and totals roughly 252,000 gross square feet on a 4-acre site in Broward County. It will house 12 courtrooms and 17 judges' chambers serving the U.S. Court of Appeals for the Eleventh Circuit, the U.S. District Court for the Southern District of Florida, and the U.S. Bankruptcy Court for the Southern District. Additional tenants include the U.S. Marshals Service, U.S. Attorney's Office, and U.S. Probation Office — agencies with fundamentally different occupancy and security requirements that must coexist within a single building envelope.


Full construction began in September 2024 and was approximately 80% complete as of April 2026, with substantial completion expected in fall 2026. The project is pursuing LEED BD+C NC Gold certification.


Section 2: Fire Protection Challenges Specific to This Project


The New Fort Lauderdale U.S. Courthouse presents a combination of fire protection design challenges that rarely appear together in a single project: high-rise occupancy triggers, multi-agency tenant occupancy separation, secure detention features, and a coastal Florida environment.


At 203 feet, the building exceeds the 75-foot high-rise threshold in NFPA 101 Section 11.8, triggering requirements for an emergency voice/alarm communication system, smoke control systems, emergency power for all life safety systems, and a designated fire command center. These requirements must be implemented across 10 floors serving fundamentally different user populations — public visitors, federal judges and staff, administrative agencies, and incarcerated individuals in transit under U.S. Marshals custody.


The presence of U.S. Marshals operations creates the most complex fire protection design challenge in the building. Prisoner holding and transfer areas require electronically locked doors that fail-safe to allow egress during a fire event while simultaneously maintaining prisoner containment. Under NFPA 101 Chapter 22, the fire alarm system and the security access control system must interface so that locked doors release in the correct sequence — without creating a security gap. Every electronically controlled door in Marshals areas requires a documented fire alarm interface and a coordinated door-release matrix, reviewed jointly by the fire protection engineer and U.S. Marshals Service facility security staff.


Beyond the detention challenge, the coastal location in Broward County demands attention to corrosion in wet-pipe sprinkler components — particularly in mechanical spaces and at exterior connections. The GSA Facilities Standards for the Public Buildings Service (P100, 2024 edition) also requires clean agent suppression coverage in evidence storage rooms, network equipment rooms, and other critical data areas, which goes beyond what the Florida Fire Prevention Code mandates on its own.


Section 3: Required Systems and Applicable Codes


Florida adopted the Florida Fire Prevention Code, 8th Edition, effective December 31, 2023. This edition incorporates NFPA 101, Life Safety Code — Florida 2021 Edition, and NFPA 1, Fire Code — Florida 2021 Edition. Sprinkler and fire alarm standards are adopted separately under Florida Administrative Code Rule 69A-3.012: NFPA 13 (2019 edition) and NFPA 72 (2019 edition). Smoke control systems are governed by NFPA 92 (2018 edition) and emergency standby power by NFPA 110 (2019 edition), both also adopted under Rule 69A-3.012. GSA P100 Facilities Standards (2024 edition) applies in parallel and sets additional federal requirements above state code minimums. The primary AHJ for plan review is Broward County Fire Rescue, applying the Florida Fire Prevention Code; federal buildings are required to comply with applicable state and local fire codes under 40 U.S.C. § 3312.


SystemApplicable StandardFL-Adopted EditionNotes
Automatic sprinklerNFPA 132019Full coverage throughout; no area-based trade-offs in high-rise
Fire alarm / EVACNFPA 722019Addressable; emergency voice/alarm per Chapter 24
Life safety / egressNFPA 1012021 (FL ed.)High-rise triggers §11.8; mixed occupancy analysis required
Smoke controlNFPA 922018Stairwell pressurization; zoned exhaust for occupied floors
Emergency powerNFPA 1102019Level 1 system; generator backup for all life safety equipment
Federal facilitiesGSA P1002024Clean agent in evidence/data rooms; central station monitoring


Section 4: What Designers Need to Think Through


For fire protection engineers on a project like this, several coordination issues must be resolved in the design phase — not during construction administration.


Occupancy classification and separation. The building houses Business occupancy (offices and chambers), Assembly occupancy (courtrooms), and Detention-adjacent features (Marshals holding areas). Designers must determine whether to treat these as separated or non-separated mixed occupancies under NFPA 101 Section 6.1.14 and document the required fire-resistance ratings for each occupancy boundary. Courtrooms with fixed seating may trigger Assembly occupancy load calculations independent of the broader Business classification.


EVAC coverage in secure areas. NFPA 101 §11.8.4 requires an emergency voice/alarm communication system throughout the building. In Marshals-controlled areas, loudspeaker placement and volume levels must satisfy NFPA 72 intelligibility requirements while also respecting security protocols that govern how fire alarm activations are communicated within detention spaces.


Detention door-release sequencing. Every electromechanical lock in Marshals areas requires a fail-safe fire alarm interface. NFPA 101 §22.2.11.5 addresses the unlocking hierarchy for detention occupancies. The fire protection engineer must produce a complete door hardware matrix and coordinate it with the security system engineer and the U.S. Marshals Service at the earliest possible design stage — before hardware schedules are issued for permit.


Smoke control and LEED coordination. Stairwell pressurization under NFPA 92 for a 10-story building involves air volumes that must be reconciled with the building's LEED Gold energy model. These systems need to be fully resolved during mechanical design, not post-occupancy.


Section 5: How ProTech CDS Approaches Projects Like This


ProTech CDS develops fire protection design documents for federal government facilities, including projects governed by the GSA P100 and subject to multi-agency tenant requirements. Our process starts with a layered code analysis that identifies every applicable standard — AHJ, state, federal, and agency-level — before any design work begins.


NICET IV review and PE seals are available in Florida and all 49 other states when the AHJ requires them. For design-build teams and prime architects coordinating federal facility fire protection, we provide drawings and specifications formatted for BIM coordination workflows, meeting both the Florida Fire Prevention Code (8th Edition) and GSA P100 (2024) requirements in a single coordinated document set. White-label delivery is available for teams that need fire protection documents under their own letterhead.


Start a project conversation at lockin.protechcds.com.


Section 6: Call to Action


Designing a federal courthouse, government facility, or high-rise with secure occupancies? ProTech CDS provides fire protection drawings and specifications in all 50 states, with NICET IV review and PE seals when the AHJ requires them. Reach out through lockin.protechcds.com to discuss your scope and schedule.

Fire Protection Design Requirements: New Fort Lauderdale U.S. Courthouse, Fort Lauderdale, FL | ProTech CDS